Report Instructions
Report templates and instructions are sent out to Principal Investigators following award. Reports and Quad charts are due by the 30th of the month following each reporting period. Reporting information, once completed, should be submitted to both INRREPORTS@inl.gov and PSDREPT@id.doe.gov, along with any project-specific reporting requirements which are distributed with awards. Reports are also required to be uploaded to FedConnect (https://fedconnect.net).
(The following templates are for Informational Purposes Only.)
Initial Work Package (Template and Instructions)
Template
Work Package Instructions for New NEUP Projects
Research Performance Progress Report Template (RPPR)
RPPR Template
Instructions
Quad Chart
Quad Chart Template
Final Reports
Reports shall include the following elements: (a) a brief abstract of the report which describes the overall objectives and results; (b) a full statement of each objective and description of the effort performed and the accomplishments achieved; (c) a list of any publication or information release made of material developed or maintained through the performance of the award; (d) a final quad chart; and (e) any other relevant information.
The final report shall contain a comprehensive summary of all work results and conclusions. All reports shall fairly and completely describe the efforts applied to and the results obtained toward achievement of objectives of the award. If an objective is not accomplished, such failure shall be fully documented and explained in the report. The final report is due within 90 days after the contract end date and should be e-mailed to psdrept@id.doe.gov and INRREPORTS@inl.gov and submitted to the Office of Scientific and Technical Information (www.osti.gov).
*Please note the PI is required to submit the Final Report and all scientific reports to the Office of Scientific and Technical Information (www.osti.gov).